Eureka Enhancement Initiative

Eureka, Missouri

Twenty-five miles southwest of downtown St. Louis, the City of Eureka sits at the edge of something remarkable: 24 square miles of preserved public land, frontage along the Meramec and Big Rivers, and some of the St. Louis region's most concentrated outdoor recreation access — all anchored by a historic small-town core. What it lacked was a clear strategy for turning those assets into a community identity and a sustainable future.

In 2018, the City of Eureka engaged DG2 Design and Active Strategies to lead the Eureka Enhancement Initiative — more than a year of active community planning that produced a comprehensive livability assessment, a new city brand and logo, a family of wayfinding and environmental graphics, and design development drawings for four key city gateways. The result was a blueprint for repositioning Eureka as a destination: not just an exit off I-44, but a genuine gateway town with the outdoor assets, community character, and civic design to match.

PLANNING & ENGAGEMENT 

The initiative was built on broad stakeholder engagement. The team conducted more than 25 individual stakeholder interviews — with aldermen, business owners, school administrators, park representatives, residents, and regional partners — and convened a community-wide stakeholder meeting attended by 26 participants. Throughout, the team maintained an ongoing working relationship with the ETown Committee, a city-established group formed specifically to guide the enhancement project.

Those conversations surfaced a clear tension: Eureka was approaching a development tipping point, with nearly 1,000 rooftops in the pipeline, and the community faced a real choice between allowing chain retail and fast food to define its future or asserting a distinctive identity rooted in its natural and cultural assets. Stakeholder themes centered on Eureka's perceived distance from the regional economy, its lack of walkable cultural amenities, and its disconnected community design — but also on the enormous opportunity those same outdoor assets represented, if the city chose to leverage them.

A livability assessment grounded the planning in data, documenting Eureka's outdoor recreation inventory (trails, parks, rivers, golf courses, camping, and more), its economic indicators, and a Walk Score of 38 — confirming what residents already knew: Eureka was a car-dependent community, and changing that would require intentional investment in connected, people-oriented design.

THE STRATEGY: ACTIVATE, CONNECT, INCUBATE, PROMOTE, ACCELERATE

The report's planning framework organized its recommendations into a progression of effort: activating the community through outdoor programming and events; connecting neighborhoods, schools, parks, and commercial districts through improved pedestrian and bike infrastructure; incubating local business growth and entrepreneurial culture; promoting Eureka's identity through branding and storytelling; and accelerating quality-of-life initiatives — particularly local food, parks, and trail development — to build lasting vibrancy.

Central to this vision was Eureka's potential as an outdoor gateway town. Surrounded by the Meramec Greenway, the Chubb and Al Foster trails, Route 66 State Park, and river access on both the Meramec and Big Rivers, Eureka already had the raw material that communities like Bentonville, Arkansas and Yellow Springs, Ohio had used to build national reputations. The initiative laid out a path for Eureka to do the same — weaving those assets into a coherent narrative and a brand that residents could rally around and visitors could discover.

GATEWAY DESIGN & BRANDING

On the physical design side, DG2 developed design development drawings for four city gateways at key I-44 interchanges and highway intersections. The gateway improvements — spanning crosswalks, sidewalk connections, planted medians, bridge painting, decorative fencing, monument signage, and wayfinding — were designed to signal arrival in a community with a distinct identity. Burns & McDonnell prepared phased cost estimates for the full gateway program, totaling approximately $10.2 million, and identified a federal funding landscape that could cover roughly $8 million of that figure through programs including CMAQ, STP, TAP, and BRM grants.

To unify the gateways with a broader visual identity, DG2 also developed a full wayfinding sign family — 13 sign types ranging from primary vehicular ID signs to pedestrian destination guides and educational/memorial markers — and designed environmental graphics for application on major bridge structures throughout the city. These elements, paired with a new "Discover Eureka" city logo developed in collaboration with Studio X, gave Eureka the brand infrastructure to project a consistent image across its public spaces and entrances.

LOOKING FORWARD

The Eureka Enhancement Initiative was conceived as a first phase, not a final answer. Its recommendations pointed toward a suite of next steps: pursuing gateway funding applications, developing a wayfinding implementation plan, executing a new parks and recreation master plan, engaging Great Rivers Greenway and the Ozark Trail Association on trail connectivity, and establishing the community task forces — Bike/Pedestrian, Meramec & Big Rivers, Brand & Culture, Connect the Community, and Local Foods — that would sustain momentum over time.

For DG2 Design, the project was both professionally and personally significant: Eureka is home. The firm's office sits within the city limits, and the work reflected a genuine investment in the community's future — the kind of long-term thinking, stakeholder trust, and place-based design intelligence that DG2 brings to every project, wherever it lands.

Specs

Client: City of Eureka, Missouri

Completed: 2018

Partners: Active Strategies; Burns & McDonnell (Cost Estimating & Funding); Studio X (Branding)