Fifth Street

St. Charles, Missouri

DG2 Design partnered  the City of St. Charles to design streetscape improvements for Fifth Street from Interstate 70 to First Capitol Drive. The project’s goals were threefold: create a memorable gateway into Saint Charles, enhance the aesthetics and safety of the heavily traveled corridor, and strengthen pedestrian connections to the city’s major destinations.

A Gateway Grounded in History and Community

With the project corridor functioning as a front door to Saint Charles, the design team prioritized improvements that felt authentically rooted in the city’s rich historic and cultural character. Through site inventory, analysis of surrounding streets, and a public meeting process that gave residents a voice in design decisions, the team developed a cohesive framework for the new streetscape. Every element — from widened sidewalks to new wayfinding signage to plant selection — was chosen to reflect and honor the corridor’s sense of place.

A Feature Wall Inspired by the River

At the heart of the design is a 200-foot-long multi-tiered stone wall, conceived as the primary focal point of the gateway. Its layered form is inspired by the movement of water in a river — a fitting reference for a city whose identity is deeply tied to its riverfront heritage. Native plantings throughout the corridor reinforce that connection to the natural landscape while providing seasonal color and low-maintenance beauty.

Safer Streets, Better Connections

Practical improvements complement the aesthetic vision: roadway pavement was upgraded along the heavily trafficked route, sidewalks were widened to invite walking, and wayfinding signage was standardized to help visitors navigate to Saint Charles’s major destinations. Pedestrian gathering points at key locations give residents and visitors places to pause, orient, and engage with the corridor — bringing Fifth Street to life as a true gateway to the city.

Project Type

Specs

Client: City of St. Charles, Missouri

Size: 1 mile

Cost: $10.7 million

Completed: 2008

Partner

CMT