Sunset Greenway
St. Louis, Missouri
Working with Great Rivers Greenway and the City of Florissant, DG2 Design provided landscape architecture for a 1.6-mile extension of Sunset Greenway. Community outreach and stakeholder input shaped the plan from the start.
Community Engagement
Pop-up events, direct mail, an online survey, and a Community Advisory Committee gave residents many ways to weigh in. Nearly 200 community members shared input, and 89% of survey respondents supported the greenway.
Open House Input
At an April 7, 2026 open house, neighbors used map stations and interactive displays to compare routes. Participants favored the Common Area route and asked for safety measures, ADA accessibility, and durable amenities.
Two Segments, One Trail
“The Flats” weaves through established neighborhoods using common areas, sidewalk expansions, and selective easements, with fencing and screening options for backyard privacy. “The Bluffs” follows natural contours through 60 acres of steep, wooded river bluff, using switchbacks, hillside tread, and elevated boardwalk where needed.
Trailhead & Outdoor Classroom
A potential trailhead offers seating, interactive art, a bike repair station, restrooms, and a pavilion. An outdoor classroom for 25 to 50 students in the wooded bluffs adds native plantings, interpretive signage, and nature play.
Crossings & Stormwater
Preliminary recommendations include a raised crossing on Bluff Parks Drive and a pedestrian hybrid beacon on Charbonier Road. Rain gardens and swales suit The Flats; check dams and boardwalks address bluff erosion.
Project Type
Services
Specs
Client: Great Rivers Greenways
Size: 1.6 miles
Cost: TBD
Completed: In design
Partner
Reitz & Jens








