Watson Road Medians
Crestwood, Missouri
DG2 Design worked with the City of Crestwood to transform nine medians along the Watson Road corridor, from Glenwood Drive to Grant Road. Historically divided by a continuous concrete median, this one-mile stretch is now reimagined as vegetated landscapes that soften the corridor, calm traffic, and provide meaningful stormwater relief.
The corridor was envisioned as a one-mile pollinator pathway through an urban setting, creating contiguous habitat and food sources that connect fragmented natural areas and support bees, butterflies, and other pollinators.
Portions of the medians were raised using custom corten steel planters to protect vegetation from salt and roadway chemicals, with the design team working closely with the civil engineer to maintain clear sight triangles and safety requirements. DG2 Design also collaborated with MoDOT to explore pollinator-themed public art within the right-of-way; while the artwork wasn't approved due to liability concerns, Phase One was completed in 2025 with six medians reconstructed and planted.
As the plant material matures and the remaining medians come online, the Watson Road corridor will stand as an example of how cities can reintroduce nature into urban infrastructure while supporting endangered pollinators.
Project Type
Services
Specs
Client: City of Crestwood, Missouri
Completed: 2025 (Phase One)






